Joints for robots that work beside peopleOrder
All writing

What ten thousand hours on the life rig taught us

Lost motion, grease and the one bearing we changed after the first run.

Field notes

Every Fulcrum design spends ten thousand hours on the life rig before we quote production volume. The rig reverses the joint under load around the clock, at an ambient temperature fifteen degrees above what most customers will ever see.

What wears

In a strain-wave gear, the flexspline teeth are the part everyone worries about. In practice the first thing to drift on our early FJ-60 builds was the output bearing preload. Lost motion crept from under half an arcminute to just over one by hour six thousand.

We moved to a cross-roller bearing with a tighter preload class and changed how the housing is torqued on the line. The second build finished the full run under one arcminute, which is now the number we publish.

Grease is a part

The lubricant is as much a component as the gear. We test every grease change on the rig before it reaches production, and the grease spec is locked in the qualification report you receive.

Why we publish it

Customers designing robots for people need to know how the joint behaves at hour nine thousand, not hour one. The raw rig data for every qualified design is available to any program under NDA.

Next: Backdrivable by design

Read