When we started, our longest lead time was not engineering. It was waiting for gear sets from a supplier who built them for someone else first.
Bringing the cell home
We bought our first gear grinder in our second year. Today the flexspline, circular spline and wave generator for every Fulcrum joint are cut and ground in Dayton.
That changed what a custom ratio costs. It is now a program on our machines and a week of testing, not a six-month conversation.
Where the eleven weeks go
Roughly two weeks of sizing and design review, four weeks of machining and winding, two weeks of assembly and end-of-line test, and three weeks of bench data before the crate leaves.